Steeped in Sydney's industrial past, White Bay Power Station offers a unique and versatile event space for businesses and creatives alike.
Venues

Built between 1912 and 1917, White Bay Power Station once powered Sydney's tram and rail network. Today, following extensive restoration efforts, it stands as a vibrant hub for arts, culture, and community.

From private gatherings through to large-scale public events, the dynamic spaces within White Bay Power Station can deliver an exceptional customer experience. 

White Bay Power Station can be hired as an entire venue, and there are also buildings that can be hired as individual spaces.

Boiler House
The Boiler House is an impressive multi-level event space full of industrial character and large windows that let in plenty of natural light. 
Learn more
Turbine Hall
The Turbine Hall is the centrepiece of White Bay Power Station. This expansive space can accommodate a wide array of events, such as exhibitions, concerts and corporate functions. 
Learn more

Permits

All contractors completing works at White Bay Power Station are required to complete the relevant permit applications.
Permits
Permits are required to ensure compliance with BCA, heritage, workcover and health, safety and environment regulations.
Find out more

Review of Environmental Factors

 A Review of Environmental Factors (REF) has been prepared by The Planning Studio NSW Pty Ltd on behalf of Placemaking NSW (PMNSW). The proposed development includes temporary activation of White Bay Power Station as an arts, cultural and entertainment venue for a range of diverse contemporary uses whilst preserving its industrial legacy as permitted within the Special Uses Zoning (SP1) of the site. The REF assesses potential environmental impacts that could arise from the ongoing temporary events, activation and enabling works at White Bay Power Station from 2024 until a decision is made about the long term use for the building. It also outlines required mitigation measures to resolve any impacts. The REF is available for public information and will be reviewed in 12 months time (August 2025) to ensure that events and activations continue to have limited impact on the community and the environment.